![]() |
![]() |
|||||||
![]() |
|
![]() |
||||||
|
|
Much of our success in estate refurbishment projects comes from having extensive expertise and dedicated personnel in construction, mechanical engineering, resident liaison and the development and implementation of innovative financial solutions. |
|||||||
![]() |
Old Park The £3.3 million general refurbishment of 115 houses and 18 flats including new roofs, windows, kitchens, plumbing, sanitary ware, heating installations and full decoration. New water mains and car parking areas for the whole estate were also incorporated. Client: High Weald Housing Association
|
|||||||
![]() |
White City The White City Estate (2,500 two and three bedroom flats) was awarded Estate Action funding for a phased programme of major enveloping and external improvement works. United House has completed seven phases over 9 years of this multi-million pound project. Client: London Borough of Hammersmith and Fulham |
|||||||
Old Oak Phase One comprised the £4 million modernisation of 152 houses. Following the successful completion of the first phase, the second and third phases were negotiated with a combined value of £14M. Client: Family Housing Association
|
||||||||
![]() |
The Mansions Full external and internal refurbishment of 45 Edwardian flats for Notting Hill Housing Trust. External works include the replacement of timber windows; renewal of tiled and asphalt roofs including associated flashings; brick and stonework cleaning and repairs; sundry metalwork and general decoration and associated works. Internally, replacement kitchen and bathroom packages are being installed along with soundproofing, thermal dry lining and new central heating. All flats are being re-wired and entry phones, fire alarms, security lighting, new entrance doors installed. |
|||||||
![]() |
Lansdowne Green Following the transfer of the estate from London Borough of Lambeth to Horizon Housing Group, United House was chosen via competitive tender to carry out Phases 4,5 and 6 of this £15 million major refurbishment project on a full partnering basis. Work includes new roofs; brick cleaning, landscaping, new lifts to tower blocks and new cold water tanks. Internally, replacement kitchens and bathrooms are being installed along with a new door entry system. All flats are being re-wired.
|
|||||||
East Thames ECRF A six week pilot scheme for the kitchen and bathroom refurbishment of five properties for East Thames Housing Group. |
||||||||
Poplar HARCA United House is partnering with East Thames Housing Group to carry out the £11m internal and external refurbishment of the Hind 50's and Hind Modern Estates in the London Borough of Tower Hamlets. Client: East Thames Housing Group |
||||||||